Saturday, January 8, 2011

Gathering Buildings

I attempted to gather a few more synths of buildings around campus in order to bulk up the model a bit, with some but not a lot of success. On top of the fact that the sun was burning me on the spot, the Red Centre and Rupert Myers Theatre didn't turn out as synthy as hoped.


The Red Centre 43% Synthy
















The Red Centre came out nicely, yet in parts, so I'm not suite sure yet how it will look in meshlab, but hopefully it's enough to create a mesh worth looking at. I think it might have been simply too big to cover properly, with out going crazy with the amount of photos taken.


Rupert Myers 29% Synthy
















Rupert Myers turned out a lot worth than expected. I thought that the certain feautres on it's corner points might allow for some kidna of easy recognition, but apprently not. I think two photos were linked properly, and the other kidn of had their own separate point clouds attached to them. This type of building, was a bad choice.


Mechanical Engineering Building 53% Synthy
















I also attempted the Mechanical Engineering Building again this time, getting a slightly lower synth value of 53%(as opposed to the previous 68%), but a much better and workable point cloud. I think is because I'd managed to get clearer shots in sunlight, and also cut out muhc of the surrounding environment in the photos, giving Photosynth less material to make mistakes with.

Now the work on the conglomeration begins.

No comments:

Post a Comment